top of page

References

  

HOKE Valve & GYROLOK Tube Fitting in The Gigantic Oil & Gas Platform

Johan Sverdrup Phase 2, NORWAY : MSF Module  14,500 tons
                                                                                                  @ Aibel (Thailand) Laemchabang
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

HOKE Valve & GYROLOK Tube Fitting in Thai Oil

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

HOKE Valve & GYROLOK Tube Fitting in PTT Tank Terminal

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

HOKE Valve & GYROLOK Tube Fitting in TPI / IRPC (First Plant)

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

After HKK Instrumentation Technologies (Thailand) Co., Ltd. presented 4 features of GYROLOK Tube Fitting and demonstrated “Burst Test with HOKE Tube”. WE ACCEPTED GYROLOK TUBE FITTING & HOKE TUBE

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Actual Burst Pressure : 30,000 psi

(5.9 times)

Working Pressure : 5,100 psi

Calc. Burst Pressure : 20,400 psi

bottom of page